Grade and drainage surveyed before quoting
Every quote starts with levels and a look at where water goes. It is the only way the number holds once we dig.
Valley soil moves and the foothills drain fast. Base depth, water and plant choice are where the budget belongs — the rest is finish.
Every quote starts with levels and a look at where water goes. It is the only way the number holds once we dig.
Six to eight inches of compacted base and edge restraint on every run. Sand over dirt is why patios move here.
Palettes that survive an August at 100° and irrigation zoned so beds and lawn are not on one schedule.
The person who drew the plan remains accountable while it is built.
Send the project and photos. We reply within two business days.
Levels, soil, access and water — usually 45 minutes at the property.
Site plan, material board and a fixed price by line item.
Scheduled window, one lead on site and clear progress notes.
Walk-through, care schedule and a first-season check-in.
Call for a direct answer, or send the short form with the property and work you have in mind.
(208) 555-0142hello@ridgelinestone.com